Research and Development

Research systems layout

Driving Industrial Progress Through Research & Technological Audits

Comprehensive technological audits and in-depth research are essential for building resilient, efficient, and future-ready industrial operations. Through systematic analysis of existing processes, performance gaps, and modernization opportunities, we help organizations optimize production, eliminate inefficiencies, and extend the operational lifetime of their facilities. Our research-driven approach enables seamless integration of next-generation technologies, ensuring industries remain competitive in an era of rapid digital transformation.

Areas focusing on research

We conduct feasibility studies and design based on our research in order to cover a wide range of production in our audits and research, and to implement our future projects at a high level of quality.

Mining industry

Power generation

Manufacture of consumer goods

Research systems layout

Reference portfolio

Practical application of Sinetic in research areas

Browse selected implementation references and open each card to see the delivery scope in more detail.

Erdenet city | Mongolia

Research in concentrator technology

  • Conducted a technology audit of the concentrator's operations
  • Technological audit of industrial water supply operations was conducted and conclusions were made
  • Based on the audit, a proposal was made to introduce a MES system at the concentrator
Ulaanbaatar city | Mongolia

Research in retransmission station at USUG

  • Research work to evaluate the equipment operation of USUG Central Pumping Station, Industrial Pumping Station, Meat Pumping Station and CHP2 Water Transmission Station in Ulaanbaatar
  • By conclusion, transfer to a fully automatic system to update the mode settings of pump stations
Ulaanbaatar city | Mongolia

Research and conclusion on the operation of power transmission (PT) station

  • Research to evaluate the reliability of equipment of PT stations in Ulaanbaatar and Darkhan, Erdenet, Shariin gol, Zuun kharaa, Baruun kharaa PT stations
  • The conclusion of the study is to ensure reliable operation of automation of relay protection control of stations
Ulaanbaatar city | Mongolia

Baganuur-Tolgoit 210 km road electrification project

  • Research work to electrify 210 km of Baganuur-Tolgoit coal transportation railway
  • Based on the research, implement an automated system for construction, management and control of power transmission substations to run electric heads on 210 km of road
Darkhan city | Mongolia

Research on 220/110kV substation automation system

  • Transfer of 110kV and 220kV substations to a fully automated system
  • Make a conclusion on the accident-free operation of Zuun kharaa and Shariin gol substations
Partner Logo
Partner Logo
Partner Logo
Partner Logo
Partner Logo
Partner Logo